


This is a study chartered by the US Congress of the feasibility of constructing a Santa Fe - Pojoaque Regional Water System. The study was published in September, 2003.
Body of Report (PDF, 14.1Mb)
Appendix 1 - Magistrate Judge's Proposed Findings and Recommended Disposition (PDF, 144Kb)
Appendix 2 - Pipeline Distribution System Preliminary Appraisal Design and Estimate (PDF, 11.9Mb)
Appendix 3 - Water Production / Transmission / Distribution System Pre-Feasibility Study (PDF, 2Mb)
Appendix 4 - Contact List (PDF, 32Kb)
Appendix 5 - NM Drought Monitoring Work Group Monthly Report (PDF, 808.5Kb)
Appendix 6 - Reference Publication List (PDF, 43.8Kb)
Appendix 7 - Exchange of San Juan-Chama Water across the Otowi Gage (PDF, 33.8Kb)
Appendix 8 - Hydrologic Impacts from Future Pueblo Development Scenarios (PDF, 14.6Mb)
Appendix 9 - Hydrologic Impacts in Pojoaque River Basin from Future Growth of Non-Pueblo Water Use (PDF, 35.6Mb)
Appendix 10 - Breakdown of Hydrologic Impacts in Pojoaque River Basin due to Out-of-Basin and In-Basin Water Use (PDF, 34.5Mb)
Appendix 11 - Hydrologic Impacts of Future Reduced Groundwater Use and Increased Surface-Water Use by the Santa Fe Area (PDF, 13.6Mb)
Appendix 12 - Santa Fe County Digital Aerial Photography and LiDAR Contour Data Metadata (PDF, 18Kb)
Appendix 13 - Final Report for Task 4 - Distribution System Design by Alternative (PDF, 248Mb)
Appendix 14 - Diversion Options (PDF, 4.1Mb)
Appendix 15 - Water Treatment Plant Design Components and Cost Estimates (PDF, 4.1Mb)
Appendix 16 - Water Transmission Trunkline Feasibility Level Design and Cost Estimate (PDF, 20.2Mb)
Appendix 17 - Final Report for Task 5 - Network Model (PDF, 64.3Mb)
Appendix 18 - Final Report for Task 3 - Deep Well / Well Field Investigation and Integration (PDF, 4.7Mb)
Appendix 19 - Final Report for Task 6 - Other System Considerations (PDF, 3.1Mb)
Appendix 20 - Cultural Resources Evaluation of Alternatives Considered (PDF, 4.5Mb)
Appendix 22 - Reconnaissance Level Environmental Evaluation - Biology - of Alternatives Considered (PDF, 2.3Mb)
Appendix 23 - Cost Estimates for Water Treatment Components and Trunkline and Distribution (PDF, 14.2Mb)
Appendix 24 - Economic Analysis of Alternatives (PDF, 3.7Mb)
Appendix 25 - Water for an Aamodt Settlement: Summary of Cost Estimates and Potential Acquisition Strategies (PDF, 183.5Kb)
Appendix 26 - Water Options Paper (PDF, 52Kb)
Appendix 27 - Re-appropriate Water Above Otowi Gage in Combination with Water Rights Firming (PDF, 39.7Kb)